MAKE YOUR PURCHASES
without credit
Supporting documents for the Save - Autonomy Program
Before starting the process to join the "Save - Autonomy" Program of the Ministry of Environment, it would be good to have gathered the necessary documents and the energy inspector will ask us, for the application, in the Program. So that we do not run at the last minute.
Briefly the documents you need to have in your possession.
(in PDF)
Building Permit the 4 A3 pages (In the old ones there can be only two)
Any legalizations in addition to square, semi-outdoor.
Purchase or Parental Supply or Horizontal Property Contract
PPC Account Both pages
Current Certificate of Declared Assets (E9) of each co-owner
Declaration E1 (This Year Income 2019) of the applicant where it appears that he has declared it as his first residence
Declaration E1 (This Year Income of 2019) of the tenant (if any other) where it appears that he has declared it as his first home
Declaration E2 (This Year Income 2019) of the Owner-Bailiff if rented.
Land Registry all pages of the registration or if no final registration has been made then the temporary post or declaration.
In all the above the same street address and number must be the same squares and in E1 and E9 the power supply number must also be correct.
Clearing E1 (This Year Income 2019) of the applicant
We also need the following, but if something does not exist we will find an alternative solution in each case.
Plans (in PDF or JPG or ACAD) Apartment Floor Plan, Floor Plan, Side View
Topographic
Details and Burner Features and last Checklist (If available).
Details and Characteristics of existing Air Conditioners if available or not read about the year of purchase.
Heating Study (If any)
Thermal Insulation Study (If any)